Cargill Fertilizer
Riverview, FL
As a part of environmental improvement efforts, Cargill Fertilizer installed a 300′ tall odor stack at their facility south of Tampa, Florida.
Jansons erected the dual wall stack whose design included a 317L stainless steel liner, A-36 steel shell with an epoxy finish coating, service platforms and aviation obstruction light system. The structure was erected in six sections using a Grove HL-150T lattice boom truck crane with 170′ of the main boom and a 160′ luffing jib section that was re-configured twice to reach the 330′ tip height.
Back to Projects



















